The floor installation started on May 30. During the last several days before that, I became a madman moving everything that wasn’t nailed down into the basement. As a result, the night before the installation started, the place was pretty darn empty.
Here’s a few photos to follow up on the progress report from a few weeks back.
As planned, the bed was the only piece of furniture left.


The only other thing left in the entire upstairs was a couple days worth of clothes.

The first floor was equally empty.

And here’s some updates on the basement.