The good news is that the floors are absolutely gorgeous; even better than I’d hoped. The bad news is that the lead installer told me he plans to finish on Saturday, but so far they’re less than half-way done. The upstairs hallway and the two front bedrooms have their floors complete except for the closets and the moulding around the edges.
The master bedroom has only half of its floor done and my bed is scattered between three rooms on two levels. The bed doesn’t matter all that much, I’ve taken several naps this week while stretched out on the living room floor. At this point, I’m so tired that sleeping on the living room floor should be a piece of cake.
But wow do the floors look good.
2 thoughts on “Installation — Day 1”
Comments are closed.
So, when are the “after” photos coming?
Probably sometime next week. My desktop computer went into the basement about a week ago and the notebook doesn’t have the ability to read memory cards.
Trying to find a card reader for the media my camera uses (“Smart Media” instead of the newer “Secure Digital”) is just a bit more hassle than I care to deal with right now.